Purpose
Purpose

Safety assessment of interlocking software, by formal verification of Trafikverket’s safety requirements, and including safety verification report in Safety Case.

Client
Client

Trafikverket / Swedish Rail

Signaling system
Signaling system

Computerized interlocking M11 for ERTMS Level 2, by Ansaldo STS

Formal Specification and Approval of Safety compliant with CENELEC SIL-4

In this project, Ansaldo STS delivers the wayside systems to Trafikverket’s ERTMS Level 2 project ESTER, including a new computerized interlocking system. Trafikverket requires that their supplier demonstrates the safety of the interlocking systems using formal verification, based on a set of safety requirements provided by Trafikverket. For the pilot line Haparandabanan in northern Sweden, Ansaldo STS licenses and uses Prover Certifier to perform the formal safety verification, and providing a safety verification report as part of the Safety Case.

Hitachi Rail STS

The technical solution is based on:

  • Formal specification of the safety requirements (based on Trafikverket’s requirements expressed in natural language) and the configuration of the interlocking under verification
  • Using a Prover Certifier-based tool chain that incorporates translation of interlocking software design into a formal model and that verifies the safety requirements

  • Creating a verification report based on the analysis results to form CENELEC SIL 4-compliant safety evidence included in the overall safety case
Related case studies

How much can you save by implementing Signaling Design Automation?

In this meeting you’ll find out how digital twins and formal methods can help you achieve your rail control projects in less time and lower costs. And 100% secure system.

Purpose
Purpose

Safety assessment of interlocking software, by formal verification of Trafikverket’s safety requirements, and including safety verification report in Safety Case.

Client
Client

Trafikverket / Swedish Rail

Signaling system
Signaling system

Computerized interlocking M11 for ERTMS Level 2, by Ansaldo STS

Formal Specification and Approval of Safety compliant with CENELEC SIL-4

In this project, Ansaldo STS delivers the wayside systems to Trafikverket’s ERTMS Level 2 project ESTER, including a new computerized interlocking system. Trafikverket requires that their supplier demonstrates the safety of the interlocking systems using formal verification, based on a set of safety requirements provided by Trafikverket. For the pilot line Haparandabanan in northern Sweden, Ansaldo STS licenses and uses Prover Certifier to perform the formal safety verification, and providing a safety verification report as part of the Safety Case.

Hitachi Rail STS

The technical solution is based on:

  • Formal specification of the safety requirements (based on Trafikverket’s requirements expressed in natural language) and the configuration of the interlocking under verification
  • Using a Prover Certifier-based tool chain that incorporates translation of interlocking software design into a formal model and that verifies the safety requirements

  • Creating a verification report based on the analysis results to form CENELEC SIL 4-compliant safety evidence included in the overall safety case