
An interlocking system is responsible for the reliable and safe movement of trains inside a station, through complex junctions and for the length of the line. The interlocking system ensures that train movement is permitted only when a route is available and the switches along this route are safely locked in their position. In all cases, the interlocking allocates a track portion or a route to one train at a time, excluding all others.
Share this article

Learn to build a solid safety case for rail control systems using formal verification
Fill out your information here.
More News & Articles
EULYNX standardizes rail signaling interfaces, but not the assurance behind them. Here's how formal methods close that gap, with exhaustive proof, generated test suites, and verified wrappers.
AI makes formal verification more important, not less. See why AI-assisted engineering needs mathematical proof, not just testing, to stay safety-critical.
Validate signaling data before supplier handover. Learn how Infrastructure Managers can reduce ERTMS project delays, rework, and integration risks with Data Readiness.


