
An interlocking system is responsible for the reliable and safe movement of trains inside a station, through complex junctions and for the length of the line. The interlocking system ensures that train movement is permitted only when a route is available and the switches along this route are safely locked in their position. In all cases, the interlocking allocates a track portion or a route to one train at a time, excluding all others.
Share this article

Learn to build a solid safety case for rail control systems using formal verification
Fill out your information here.
More News & Articles
At ISoLA 2026 in Kos, Greece, Prover presented three papers on railway signaling: two from the ForTeS project on formal verification and testing of EULYNX specifications with Prover PSL, and one on validating architectural variants of ETCS trackside systems in a single ontology-driven framework.
When replacing relay interlockings, most conversations start with technology. The better starting point is governance: how do you make sure you can still change parts of the system 20 years from now? We look at what Open Signaling means in practice, and how our Stockholm Metro pilot was designed for replaceability from day one.
Prover, RATP and Systerel publish the unified HLL 4.0 specification, keeping the rail industry's formal verification language open and free of dialects.


