
Relay based interlocking (RBI) is an interlocking system consisting of a complex circuitry made up of relays in an arrangement of relay logic that ascertains the state or position of each signal appliance.
Share this article

Learn to build a solid safety case for rail control systems using formal verification
Fill out your information here.
More News & Articles
EULYNX standardizes rail signaling interfaces, but not the assurance behind them. Here's how formal methods close that gap, with exhaustive proof, generated test suites, and verified wrappers.
AI makes formal verification more important, not less. See why AI-assisted engineering needs mathematical proof, not just testing, to stay safety-critical.
Validate signaling data before supplier handover. Learn how Infrastructure Managers can reduce ERTMS project delays, rework, and integration risks with Data Readiness.


