
Very excited to announce that our VP of Sales, Gunnar Smith, was recently interviewed by Global Railway Review. The article is now available online and open for everyone to read.
In the interview, Gunnar explains how the railway industry can overcome the challenges of rail control projects. He talks about the typical challenges faced in the procurement and development of rail control projects and how these can be mastered with a modern approach based on Signaling Design Automation (SDA) and the use of digital twins early on in the projects.
Go to Global Railway Review’s website to read the full article.
Share this article

Learn to build a solid safety case for rail control systems using formal verification
Fill out your information here.
More News & Articles
Prover, together with NEAT, Schneider Electric, and Pilz will demo real railway interoperability at InnoTrans: three vendor platforms, one interlocking design, live at Prover's booth.
EULYNX standardizes rail signaling interfaces, but not the assurance behind them. Here's how formal methods close that gap, with exhaustive proof, generated test suites, and verified wrappers.
AI makes formal verification more important, not less. See why AI-assisted engineering needs mathematical proof, not just testing, to stay safety-critical.


