
Very excited to announce that our VP of Sales, Gunnar Smith, was recently interviewed by Global Railway Review. The article is now available online and open for everyone to read.
In the interview, Gunnar explains how the railway industry can overcome the challenges of rail control projects. He talks about the typical challenges faced in the procurement and development of rail control projects and how these can be mastered with a modern approach based on Signaling Design Automation (SDA) and the use of digital twins early on in the projects.
Go to Global Railway Review’s website to read the full article.
Share this article

Learn to build a solid safety case for rail control systems using formal verification
Fill out your information here.
More News & Articles
Prover, RATP and Systerel publish the unified HLL 4.0 specification, keeping the rail industry's formal verification language open and free of dialects.
Generative AI has entered railway software engineering ahead of the standards governing it. A new CENELEC draft amendment to EN 50716 doesn't add requirements. It clarifies which existing rules apply when AI drafts specs, writes code, or generates test cases, and why those rules are harder to satisfy with generative models than teams might assume.
Prover, together with NEAT, Schneider Electric, and Pilz will demo real railway interoperability at InnoTrans: three vendor platforms, one interlocking design, live at Prover's booth.


