
The European Rail Traffic Management System, or ERTMS, ERTMS was introduced by the EU in 1992 as a means of creating a uniform system of command, control and coordination of rail traffic to allow for ‘‘interoperability’’ throughout EU territory. The ERTMS standard exists at three levels (ERTMS 1, 2 and 3) depending on use, each distinguished by the type of wayside and on-board equipment used and the manner in which this equipment communicates relevant data.
Share this article

Learn to build a solid safety case for rail control systems using formal verification
Fill out your information here.
More News & Articles
At ISoLA 2026 in Kos, Greece, Prover presented three papers on railway signaling: two from the ForTeS project on formal verification and testing of EULYNX specifications with Prover PSL, and one on validating architectural variants of ETCS trackside systems in a single ontology-driven framework.
When replacing relay interlockings, most conversations start with technology. The better starting point is governance: how do you make sure you can still change parts of the system 20 years from now? We look at what Open Signaling means in practice, and how our Stockholm Metro pilot was designed for replaceability from day one.
Prover, RATP and Systerel publish the unified HLL 4.0 specification, keeping the rail industry's formal verification language open and free of dialects.


